OCIS contributed to the renovation of the Bayer production site in Garbagnate Milanese. Changes were made to adapt the plants to the GMP Guidelines, limiting production stops to scheduled shutdowns only.

Key facts of the project

Revamping of HVAC systems for the production and packaging of classified areas:

  • About 20 work packages for different areas of intervention
  • Scheduled installations to minimize production downtime
  • Installation of new cold water production and distribution
  • Installation of hot water generation system with steam exchanger
  • Installation of new compressors and inox piping distribution
  • Electrical boards supply and installation
  • Building A6: new changing rooms and personnel airlock for sterile rooms
  • Building A7: revamping of production areas
  • Building A8: renew of warehouse and new sampling area
  • Installation of 10 new HVAC systems with air handling unit, duct, and utilities
  • Installation of the new electrical system from the main cabinet to final equipment
  • Installation of fire fighting system as gas extinguishing system and fire detection system
  • Supply of new water-cooled chiller with evaporative towers
  • Installation of 2 low humidity systems with the supply of munters unit
  • Installation of all utilities such as chilled and hot water for HVAC, sanitary water, compressed air, steam, and condensate