Home › Projects › BAYER GMP-UP BAYER GMP-UP Client: Bayer HealthCare Manufacturing S.r.l. Date: Mar 2020 – Dec 2022 ConstructionPharma OCIS contributed to the renovation of the Bayer production site in Garbagnate Milanese. Changes were made to adapt the plants to the GMP Guidelines, limiting production stops to scheduled shutdowns only. Revamping Building A6 – Before Revamping Building A6 – Final Lifting UTA AA28 – Comprimitura UTA AA-48 Picking Area Building A7 Primary & Secondary Packaging Key facts of the project Revamping of HVAC systems for the production and packaging of classified areas: About 20 work packages for different areas of intervention Scheduled installations to minimize production downtime Installation of new cold water production and distribution Installation of hot water generation system with steam exchanger Installation of new compressors and inox piping distribution Electrical boards supply and installation AREAS OF ACTION Building A6: new changing rooms and personnel airlock for sterile rooms Building A7: revamping of production areas Building A8: renew of warehouse and new sampling area INDUSTRIAL PLANTS CONSTRUCTED Installation of 10 new HVAC systems with air handling unit, duct, and utilities Installation of the new electrical system from the main cabinet to final equipment Installation of fire fighting system as gas extinguishing system and fire detection system Supply of new water-cooled chiller with evaporative towers Installation of 2 low humidity systems with the supply of munters unit Installation of all utilities such as chilled and hot water for HVAC, sanitary water, compressed air, steam, and condensate Key numbers of the project 150 Kg of Ducts 20 Km of Cables 3 Years of Work 9.5 Value (in mio €) Related projects Construction Pharma Quality Control Labs Expansion OCIS installed all mechanical HVAC, electrical and fire-fighting systems, and dealt with the generation and distribution of all utilities. Read more Construction Pharma LLIn Facility Project OCIS developed new hydraulic systems to power the equipment and HVAC for the latest production department. Read more Construction Data Center Data4 Campus – Construction OCIS realized the mechanical and fire-fighting infrastructure of the site and the mechanical and air-conditioning systems. Read more All Projects