Data4 Campus – Construction

Client: Data4 Italy S.r.l. Date: 2013 – Ongoing

OCIS contributed to the construction of the Data4 Campus, located between Settimo Milanese and Cornaredo, Milan, by realizing both the mechanical and fire-fighting infrastructure of the site and the mechanical and air-conditioning systems of the individual buildings.

Key facts of the project

  • Realization of HVAC and mechanical systems for a total of 10 buildings
  • 2 buildings currently under construction
  • Implementation of the campus mechanical infrastructure
  • HVAC installations
  • Utilities distribution
  • Sanitary water system and water collection networks
  • Sprinkler systems, water mist, hydrants
  • Smoke extraction systems
  • Fire station
  • Water distribution rings
  • Rainwater collection networks
  • Booster groups serving the lamination basins