Home › Projects › ST Agrate – Hook Up ST Agrate – Hook Up Client: STMicroelectronics S.r.l. Date: 2021 – Ongoing ConstructionAdvanced Technologies OCIS contributed to the set-up of the new clean room at the R3 department, located at the ST site in Agrate, by providing its know-how of project management and construction activities aimed at realizing the hook-up of equipment used in the various stages of the production process. Mechanical piping connections Gas connections Mechanical and electrical connections Electrical panels and distribution Connections in plastic material Utilities connections Key facts of the project The clean room hook-up project was developed in three distinct work phases: Pilot phase; HBO (Half Build Out) phase A and B; FBO phase (Full Build Out). UTILITIES Bulk gases (N2uhp / Aruhp /Heuhp / O2uhp. Standard gas (CDA/O2-Scr/ N2S) Specilaty Gas Single envelope (inerts). Specilaty Gas Double envelope (Toxic,Flammable,Corrosive) Liquid Fluid (PCW, SW, CH4 TPU, UPW/DIW, VACUUM) Key numbers of the project 60 hook-ups completed 50 specialized resources 3 years 20 Value (in mio €) Related projects Construction Data Center Data4 Campus – Construction OCIS realized the mechanical and fire-fighting infrastructure of the site and the mechanical and air-conditioning systems. Read more Construction Pharma BAYER GMP-UP OCIS contributed to renovating the production site to align with GMP Guidelines and to minimize production stops. Read more Construction Pharma LLIn Facility Project OCIS developed new hydraulic systems to power the equipment and HVAC for the latest production department. Read more All Projects