Home › Projects › LLIn Facility Project LLIn Facility Project Client: GlaxoSmithKline S.p.A. Date: Jun 2022 – Sep 2023 ConstructionPharma OCIS has contributed to developing new hydraulic systems in the industrial utilities category to power the equipment and HVAC (facility and process) for the new premises of the production department called “FIALE 1”. Inox pipe distribution in technical area Exchangers in area sfiati New chiller area Exhaust and process ventilation Key facts of the project Intervention for the building P: Revamping of mechanical systems for HVAC and process equipment supplies to serve the new department AREAS OF ACTION Interventions for building P: Technical area LYO Filling area Tunnel and washer area Autoclaves and S.P. washer area Compounding and dispensing area INDUSTRIAL PLANTS CONSTRUCTED Construction of a new refrigeration system for the production and distribution of chilled water Hot water distribution from existing tie-in Steam and condensate distribution from existing predisposition Implementation of energy meter system Installation of exhaust ventilation and drain from process equipment Key numbers of the project 45 Kg of inox piping 16 months of work 60 hours of work 3.5 Value (in mio €) Related projects Construction Pharma BAYER GMP-UP OCIS contributed to renovating the production site to align with GMP Guidelines and to minimize production stops. Read more Construction Pharma Quality Control Labs Expansion OCIS installed all mechanical HVAC, electrical and fire-fighting systems, and dealt with the generation and distribution of all utilities. Read more Construction Data Center Data4 Campus – Construction OCIS realized the mechanical and fire-fighting infrastructure of the site and the mechanical and air-conditioning systems. Read more All Projects