Home › Projects › Quality Control Labs Expansion Quality Control Labs Expansion Client: GlaxoSmithKline S.p.A. Date: Dec 2015 – Sep 2017 ConstructionPharma OCIS hired to construct all mechanical HVAC, utilities generation and distribution, electrical and fire-fighting systems in the new B61 quality control building. Corridor Microbiology and Sterility Immunology laboratories Site utilities distribution to B61 Chilled water group in penthouse Piping rack for HVAC equipment Key facts of the project Construction of mechanical systems for HVAC and fire-fighting to serve the new department. AREAS OF ACTION The new building is composed of three laboratories floors plus a roof top penthouse and a basement, as described below: Basement floor: housing site utilities distribution to B61, technical utilities generation, HVAC equipment and plants, waste management, centralized washing, archive, electrical substation Ground floor: housing raw material, sample management laboratories and general changing rooms First floor: housing finished product, seed control, sterility, microbiology and EM/Media testing laboratories Second floor: housing cells, immunology laboratories and office area; Penthouse: housing HVAC equipment and plants INDUSTRIAL PLANTS CONSTRUCTED A new refrigeration system for the production and distribution of chilled water A new system for the production and distribution of hot water Steam and condensate circuit to feed a new hot water producer Installation of a liquid nitrogen line system to supply cryostats Execution of gas extinguishing system for documentation archive room Installation of fire hydrants and sprinkler circuits Installation of medical gas lines Execution of RX and NDT for welding log Key numbers of the project 50 Kg of Duct 30 Kg of Piping 2 Years of Work 4.5 Value (in mio €) Related projects Construction Pharma LLIn Facility Project OCIS developed new hydraulic systems to power the equipment and HVAC for the latest production department. Read more Construction Pharma BAYER GMP-UP OCIS contributed to renovating the production site to align with GMP Guidelines and to minimize production stops. Read more Construction Data Center Data4 Campus – Construction OCIS realized the mechanical and fire-fighting infrastructure of the site and the mechanical and air-conditioning systems. Read more All Projects